ALEXANDRIA, VA, May 24, 2011 – PD Systems , a privately held Service-Disabled Veteran-Owned Small Business, announced today they have been awarded a contract to provide load bank labor and material support to complete the Air Force generator test program conducted by Army Test and Evaluation Command, Aberdeen Test Center. PD Systems will provide load banks to support the required reliability testing, which will be performed over 3000-hours reliability test on eight Base Expeditionary Airfield Resources (BEAR) Power Units (BPUs).
The testing is scheduled to begin late-May 2011 and end in December 2011, with possibility of three (3) one-month extensions.
PD Systems is a solutions oriented company providing a wide range of Logistics and Engineering Domain services. The company’s portfolio includes Operational Logistics, Training Services, Engineering Services, Energy Solutions, and Sustainment Support. For more information about PD Systems , please visit the company’s web site at www.pd-sys.net.
CONTACT: PD Systems
John Sutton
VP Business Development
jsutton@pd-sys.net
SOURCE: PD Systems